Bell Post Hill: GoodWe 16.6 kWh battery added to existing solar (June 2026)
A 16.6 kWh GoodWe battery added to the existing solar on a home in Bell Post Hill.
Location: Bell Post Hill, Geelong
Installed: June 2026
System: 16.6 kWh GoodWe battery with a 6 kW GoodWe hybrid inverter, added to existing solar
A local homeowner in Bell Post Hill already had solar panels and asked our team to add a battery. We installed a 16.6 kWh GoodWe battery with a 6 kW GoodWe hybrid inverter in June 2026.
The new battery is connected alongside the existing solar system (an “AC-coupled” set-up), so the home’s existing solar inverter stays in place and keeps running the panels.

16.6 kWh
GoodWe battery
6 kW
GoodWe hybrid inverter
June 2026
installed
7 kWh
from the battery each night (Oct 2026 average)

What the homeowner wanted
To store the daytime solar the home was already making and use it in the evening, without replacing the solar system they already had.
What we installed
- GoodWe 6 kW hybrid inverter (GW6K-EHA)
- GoodWe battery: 2 × 8.3 kWh modules (GW8.3-BAT-D) = 16.6 kWh in total
- GoodWe smart meter at the switchboard, so the system knows when to charge and when to power the house
- New safety switches (RCDs) on the switchboard
- A weather cover over the battery, at the homeowner’s request
- A clean and inspection of the existing solar panels
- Installed by our team: designed and installed by our installation team.

Results so far
From 1 to 19 October 2026 the battery stored 157.8 kWh of the home’s surplus solar and supplied 139.4 kWh back to the home, about 7 kWh a night on average.
Source: GoodWe SEMS monitoring for this system, 1–19 October 2026.
Thinking about adding a battery in Bell Post Hill?
Related pages: Home batteries we install · Solar in Geelong · Price guide · More Velocity Solar case studies